BLD-Final | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | DONE |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Zach Phone #: ###-####
|
BLD-Final | 11/13/2018 | 11/14/2018 | 11/15/2018 | P | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
FIRE-Final Inspection | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | DONE |
Adele J Schaffeld-Griffin
|
|
|
No fire inspection required for Bathroom remodel. AJS 11-14-18 Zach Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | PASS |
Dave Hannah
|
|
|
Zac Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Jim Sly
|
|
|
Zack Phone #: ###-####-1st floor mens and womens Framing Pass
|
BLD-Framing/Rough-in | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | DEFR |
Jim Storey
|
|
|
Zack Phone #: ###-####-1st floor mens and womens out of time
|