BLD-Final | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Dave Hannah
|
|
|
Eric-building permit needs to be finaled when BLD18-03751 is for STE 60 Phone #: ###-####
|
DOC - Permit Finaled | | | 10/31/2018 | | DONE |
|
|
|
Per all passing inspections
|
FIRE-Final Inspection | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Jim Page
|
|
|
Previously noted items for life fire safety have been corrected, final life fire safety inspection for area of work complete.
Eric-fire permits were finaled but no fire life safety was called Phone #: ###-####
|
BLD-Final | 10/22/2018 | 10/23/2018 | 10/23/2018 | P | NR |
Tony Young
|
|
|
Eric Phone #: ###-####,, needs f/l/s 1st
|
FIRE-Final Inspection | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm notification modifications are required for the strobe just inside of the main entry and the stobe in the main corridor. They are overspaced as set at 30cd. All other items appear ok.
Eric Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Tony Young
|
|
|
Eric Phone #: ###-####,, ceiling grid ok
|