BLD-Energy code compliance | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Jim Sly
|
|
|
Access off Franklin - Chad Phone #: ###-####
|
BLD-Energy code compliance | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
Mike Jordan
|
|
|
Chad Phone #: ###-####
|
BLD-Other | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | CANC |
Mike Jordan
|
|
|
Chad-air seal Phone #: ###-####
|
BLD-Framing/Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Mike Jordan
|
|
|
Chad-air seal Phone #: ###-####
|
BLD-Framing/Rough-in | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-####. Complete airseal pack. Provide non shrink grout under base plates.
|
BLD-Wall Bracing | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | NR |
Dave Hannah
|
|
|
Tony Phone #: ###-#### needs trades
|
BLD-Wall Bracing | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | CANC |
Mike Jordan
|
|
|
Tony Phone #: ###-####
|
BLD-Wall Bracing | 10/17/2018 | 10/17/2018 | 10/17/2018 | A | FAIL |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Still noted areas were fasteners are missing.
|
BLD-Framing/Rough-in | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | FAIL |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Noted several areas were fasterners are missing or over spaced on SW 1 type shearwlls. Also noted over spaced fasteners on SW 2 type shearwalls. Also provide the 2 rows of fsteners on the sill plates at the required spacing as per the engineering. Correction notice posted.
|
BLD-Foundation | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Mike Jordan
|
|
|
Please call ahead concrete comming at 3:30 // Doug Phone #: ###-####
|
BLD-Foundation | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | CANC |
Dave Hannah
|
|
|
Please call ahead concrete comming at 3:30 // Doug Phone #: ###-####
|
BLD-Footing | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Brandon Shaw
|
|
|
Please call ahead for access Done by 9, pouring at 3 -Doug Phone #: ###-####
|
BLD-Footing | 7/19/2018 | 7/20/2018 | 7/20/2018 | P | FAIL |
Mike Jordan
|
|
|
spoke about possibly being there at 1// Doug Phone #: ###-####. Missing rebar in pit. Needs geotech report for pit footing and interior footing.
|
BLD-Foundation | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Jim Sly
|
|
|
Doug---rebar--prefer early morning, pouring concrete at 3pm Phone #: ###-####
|
BLD-Footing | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Perimeter footings ok.
|
BLD-Footing | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | NR |
Mike Jordan
|
|
|
Doug Phone #: ###-####-please call to meet
|
Extend Permit 90/180 days | 6/21/2018 | 6/25/2018 | 6/25/2018 | A | FAIL |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Several areas were rebar is on ground and less than 3 inches of clearance. Verts to be tied in place prior to placing concrete. Correction notice posted.
|
BLD-Footing | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | NR |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|