BLD-Final | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Dave Hannah
|
|
|
Please call prior to arrival for access to building floors-Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Final | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | NR |
Mike Jordan
|
|
|
Ron Phone #: ###-####
|
BLD-Final | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PART |
Dave Hannah
|
|
|
zack Phone #: ###-#### ok for tco
|
FIRE-Final Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Derek Phone #: ###-####
|
FIRE-Final Inspection | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | CANC |
Jim Page
|
|
|
zack Phone #: ###-####
|
BLD-Final | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | NR |
Dave Hannah
|
|
|
zack Phone #: ###-####
|
BLD-Final | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | NR |
Dave Hannah
|
|
|
Dereck-wants temp c of o Phone #: ###-####
|
FIRE-Final Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety inspection complete. TCO authorized for life safety pending fire alarm completion associated with project. Permit for life fire safety can be finaled when remaining noted items on fire alarm are complete.
Dereck-wants temp c of o Phone #: ###-####wants temp c of o
|
FIRE-Conference | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete
Zack Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/23/2018 | 10/23/2018 | 10/24/2018 | A | DONE |
Dave Hannah
|
|
|
Derek Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/24/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Dave Hannah
|
|
|
Derek Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | NR |
Mike Jordan
|
|
|
Please call Derek or Zach 30 Minutes prior to arriving.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald. No call back and no access to jobsite. Will need to reschedule.
|
BLD-Framing/Rough-in | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PASS |
Dave Hannah
|
|
|
This inspection is for hard lid soffits on floor 10. Please call upon arrival and I will get you up to the floor. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Ceiling Grid Inspection | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PART |
Brandon Shaw
|
|
|
12th floor phase 1...
|
BLD-Framing/Rough-in | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PART |
Dave Hannah
|
|
|
Zack Phone #: ###-#### hard lids soffits ok to cover
|
BLD-Framing/Rough-in | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Dave Hannah
|
|
|
Rough framing on 10th floor minus plumbing wall at South west area. Please call upon arrival and I can bring you to the floor I will be back onsite at 1:00 pm today.
Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD-Framing/Rough-in | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Dave Hannah
|
|
|
Please call upon arrival for access for 12th floor framing inspection. Thank You. Phone #: ###-#### Inspection requested via web by Ron Oswald
|