BLD-Final | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Temp fix applied for windows on second floor Phone #: ###-#### Inspection requested via web by Gus Brandon
|
DOC - Permit Finaled | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | FAIL |
Brandon Shaw
|
|
|
Window fall protection R312.2- upstairs bedroom windows...
|
BLD-Blower Door Test Results | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.45
|
BLD-Framing/Rough-in | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Brandon Shaw
|
|
|
Insulation... Corrections SAT...
|
BLD-Other | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PASS |
Brandon Shaw
|
|
|
Soffit...
|
BLD-Framing/Rough-in | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | FAIL |
Brandon Shaw
|
|
|
Provide propre hardware for anchor bolts and hold downs- see orange paint... Provide strap as indicated by framing note #9... As per plan note #10- In stall A34 clips and nail accordingly...
|
BLD-Wall Bracing | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | FAIL |
Brandon Shaw
|
|
|
See Framing rough notes...
|
BLD-Framing/Rough-in | 3/18/2019 | 3/20/2019 | 3/19/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Wall Bracing | 3/18/2019 | 3/20/2019 | 3/19/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Conference | 3/7/2019 | 3/7/2019 | 3/7/2019 | A | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Aging Inspection | 3/7/2019 | 3/7/2019 | 3/7/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Aging Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Foundation | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PART |
Mike Jordan
|
|
|
Edger Phone #: ###-####
|