BLD-Final | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Mike Jordan
|
|
|
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
FIRE-Final Inspection | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Mike Jordan
|
|
|
Mike Jordan will be the Fire Inspector today for the BLD. Lee will be out for the alarm final the PM as well. Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman. Per Lee Merideth the project related fire alarm permit has been finaled. Ok for perm occ.
|
BLD-Final | 9/3/2018 | 9/4/2018 | 9/4/2018 | A | PART |
Jim Sly
|
|
|
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman OK for Temp Occ. OK for Perm Occ. when Fire signs for Perm.
|
FIRE-Final Inspection | 9/3/2018 | 9/4/2018 | 9/4/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is ok until the existing fire alarm system has been extended into this new tenant space.
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
FIRE-Final Inspection | 8/29/2018 | 8/30/2018 | 8/30/2018 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when a fire alarm permit is issued/inspected for the work that is needed in this tenant space. Furniture is ok to be placed in space only.
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
BLD-Ceiling Grid Inspection | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Jim Sly
|
|
|
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman
|
BLD-Energy code compliance | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | CANC |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 7/17/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|