BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Storey
|
|
|
Bobby Phone #: ###-####
|
DOC - Permit Finaled | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | DONE |
Jim Storey
|
|
|
Bobby Phone #: ###-#### 4.16
|
BLD-Energy code compliance | 11/19/2018 | 11/26/2018 | 11/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 11/19/2018 | 11/21/2018 | 11/21/2018 | A | PART |
Jim Storey
|
|
|
todd Phone #: ###-#### head height at stair/beam// smoke dec. min 24 from highest part of ceilling/ stair rim not insulated
|
BLD-Wall Bracing | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Jim Sly
|
|
|
Todd Phone #: ###-#### Ext. nailing only........OK.
|
BLD-Energy code compliance | 11/8/2018 | 11/9/2018 | 11/8/2018 | P | CANC |
Jim Storey
|
|
|
Todd Phone #: ###-####// canc per Todd, called in on wrong address 11/8/18 leg
|
BLD-Footing | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | CANC |
Jim Storey
|
|
|
Jose-pour time 3:00 Phone #: ###-####
|