BLD-Final | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Mike Jordan
|
|
|
Gate Code: #9898 Garage Code: 6365 Phone #: ###-#### Inspection requested via web by Jessica Bradley
|
DOC - Permit Finaled | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 8/9/2019 | 8/9/2019 | 8/9/2019 | A | DONE |
Mike Jordan
|
|
|
4.4
|
BLD-Energy code compliance | 12/26/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Brandon Shaw
|
|
|
Garage Code 6365 Phone #: ###-#### Inspection requested via web by Jessica Bradley
|
BLD-Energy code compliance | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley. The required insulation on the 3/4" hot water lines has not been completed/inspected.
|
BLD-Framing/Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Mike Jordan
|
|
|
Gate Code #9898 Phone #: ###-#### Inspection requested via web by Jessica Bradley. A reinspection is required by the plumbing inspector for the insulating of the requred hot water lines.
|
BLD-Framing/Rough-in | 12/17/2018 | 12/18/2018 | 12/17/2018 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jessica Bradley Inspection cancelled from web by: Jessica Bradley
|
BLD-Framing/Rough-in | 12/14/2018 | 12/17/2018 | 12/17/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley. Needs mech. rough in inspection for HVAC.
|
BLD-Wall Bracing | 11/5/2018 | 11/8/2018 | 11/8/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley
|
BLD-Foundation | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 10/14/2018 | 10/15/2018 | 10/15/2018 | A | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|