BLD-Final | 2/11/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
Mike Jordan
|
|
|
Call 15 minutes ahead // Jeff Phone #: ###-####. OK for perm occ. Exterior buildings have been removed.
|
FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Previous corrections made. Per notes Troy James verified dust collection. The racks have been removed and there is no paint booth within the scope of work.
Call 15 minutes ahead // Jeff Phone #: ###-####
|
BLD-Conference | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | DONE |
Mike Jordan
|
|
|
Brad Phone #: ###-####.. Due to change in use the ADA restrooms are required to be upgraded. Needs to pull building permits for the shelters on the west side of the exisitng building and resolve all fire/life/safety issues and electrical issues.
|
BLD-Final | 12/4/2018 | 12/7/2018 | 12/7/2018 | A | CANC |
Mike Jordan
|
|
|
Brad Phone #: ###-####
|
FIRE-Final Inspection | 12/4/2018 | 12/6/2018 | 12/6/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide revised floor plan showing the actual wall layout and that door 106 is not there , provide exit signs/emergency lights as per the plans and review comments or get revised plans, remove dead bolt from west side door and provide single action hardware for the restroom door, provide fire sprinkler coverage for the lean too's/sheds that are attatched to the building, provide racking permit for the storage racks that exceed 8'
Brad Phone #: ###-####
|