BLD-Final | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | NR |
Jim Sly
|
|
|
Vicky or Diana Phone #: ###-#### Can final when handrail installed on main stairway.
|
BLD-Framing/Rough-in | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-#### No stairs in yet........
|
BLD-Final | 10/4/2018 | 10/5/2018 | 10/5/2018 | A | NR |
Jim Sly
|
|
|
Johan Phone #: ###-#### Complete corrections.
|
BLD-Final | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | FAIL |
Jim Sly
|
|
|
Vicki Phone #: ###-#### C/N posted.......Address #s non complying stairway.
|
BLD-Final | 9/18/2018 | 9/20/2018 | 9/19/2018 | A | CANC |
Jim Sly
|
|
|
Vicki Phone #: ###-####
|
BLD-Final | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | NR |
Jim Sly
|
|
|
Dan Phone #: ###-#### Need Plumbing final. Cannot verify if Electrical permit and final complete. Give specific directions to home when calling in inspections.
|