BLD-Final | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
DOC - Permit Finaled | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | DONE |
Mike Jordan
|
|
|
4.4ACH @50 pa.
|
BLD-Final | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | FAIL |
Mike Jordan
|
|
|
Mechanical scheduled for AM today. Phone #: ###-#### Inspection requested via web by David Scaggs. Install seal on 20min fire door and set hinges so door is self closing. provide blower door test results and post.
|
FIRE-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | CANC |
Troy Cobbley
|
|
|
No life safety sign off required. Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Final | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | NR |
Mike Jordan
|
|
|
Mec inspection scheduled for today, also. Phone #: ###-#### Inspection requested via web by David Scaggs. Needs mech. final inspection.
|
BLD-Energy code compliance | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Framing/Rough-in | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Wall Bracing | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Wall Bracing | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | FAIL |
Brandon Shaw
|
|
|
Hold downs still need to be installed, 4 locations... See red paint...
|
BLD-Wall Bracing | 11/13/2018 | 11/14/2018 | 11/14/2018 | P | FAIL |
Mike Jordan
|
|
|
Will have plans onsite by mailbox. Phone #: ###-#### Inspection requested via web by David Scaggs. Install all missing holddowns. Install all missing blocking and nail. Provide the additional engineering. Correction notice posted.
|
BLD-Wall Bracing | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. No approved plans on site.
|
BLD-Foundation | 10/4/2018 | 10/5/2018 | 10/5/2018 | A | PART |
Mike Jordan
|
|
|
after 11-Terry Phone #: ###-####. Also appears that footing issue has been reolved. In place footing measures 8 inches in thickness.
|
BLD-Footing | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | FAIL |
Mike Jordan
|
|
|
Concrete at 10 // Terrie Phone #: ###-####. North east exterior footing does not have the min. required 8 inch thickness as required by IRC. A coorection notice was issued.
|