BLD-Final | 5/13/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | FAIL |
Jim Storey
|
|
|
Rusty Phone #: ###-#### min 1.5 inches handrail to floor cap.
|
BLD-Blower Door Test Results | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | DONE |
Jim Storey
|
|
|
Rusty Phone #: ###-#### 4.17
|
BLD-Final | 5/7/2019 | 5/8/2019 | 5/8/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need ELE final...
|
FIRE-Final Inspection | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | CANC |
Troy Cobbley
|
|
|
No life safety sign off required. Mike Phone #: ###-####
|
BLD-Final | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | NR |
Jim Storey
|
|
|
Mike Phone #: ###-#### need ele
|
BLD-Energy code compliance | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Other | 1/24/2019 | 1/24/2019 | 1/24/2019 | A | PART |
Jim Storey
|
|
|
Insulation Inspection Phone #: ###-#### Inspection requested via web by Mike Cook need vappor barrior on lower walls
|
BLD-Other | 1/22/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Jim Storey
|
|
|
Garage 1 hour wall sheetrock ; soffit inspection. As close to noon as possible please. Phone #: ###-#### Inspection requested via web by Mike Cook
|
BLD-Framing/Rough-in | 1/17/2019 | 1/18/2019 | 1/18/2019 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### pending ele ok to insulate.
|
BLD-Wall Bracing | 12/28/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Cook
|
BLD-Foundation | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | PART |
Mike Jordan
|
|
|
wall // Allan Phone #: ###-####
|
BLD-Foundation | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Bob Archibald
|
|
|
Ryan Phone #: ###-####
|