BLD-Final | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Brandon Shaw
|
|
|
Garage code 0306 Phone #: ###-#### Inspection requested via web by Elena Stephens
|
DOC - Permit Finaled | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.2
|
BLD-Energy code compliance | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 2/25/2019 | 2/27/2019 | 2/27/2019 | A | PART |
Jim Sly
|
|
|
Inspection requested via web by Marc Foote Framing ......OK except one thing.....Missing nut on H D......South West bedroom....Marked X. OK to insulate tried to call no tele #
|
BLD-Wall Bracing | 2/8/2019 | 2/11/2019 | 2/11/2019 | A | PART |
Jim Sly
|
|
|
Inspection requested via web by Marc Foote Exterior sraps and nailing OK. C/N provide 4 retro fit HDs at West wall.....South end at locations circled on plan. OK to cover exterior
|
BLD-Wall Bracing | 2/5/2019 | 2/8/2019 | 2/8/2019 | P | CANC |
Jim Sly
|
|
|
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
|
BLD-Footing | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Jim Storey
|
|
|
Pouring at 1:30 // Mark Phone #: ###-####
|