BLD-Final | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Dave Hannah
|
|
|
Morgan came in with pictures of the pressure tests being done for the machines-please sign off in system Phone #: ###-####
|
BLD-Final | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PEND |
Dave Hannah
|
|
|
Morgan Phone #: ###-####-please call for access Dave, please verify "This door.....signage over exit doors. Thank you Adele ok for perm occ after plumbing finals
|
FIRE-Final Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PASS |
Adele J Schaffeld-Griffin
|
|
|
Will have building inspector verify signage over exit doors installed.
Current fire ext installed on main floor and basement, building fully fire sprinklered.
Morgan Phone #: ###-####-call for access
|