BLD-Final | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | NR |
Dave Hannah
|
|
|
John Phone #: ###-#### needs fire finals
|
FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | FAIL |
Jim Page
|
|
|
Need to have the fire sprinker issue resolved with fire department and plan review. Also need to test the fire alarm system in effected rooms due to possible issues with devices getting saturated.
Dave Phone #: ###-####
|
FIRE-Final Inspection | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for units 101 and 402 complete, level 3 unit to be completed at a later date. Will need to test fire alarms in effected units before permit can be finaled.
John- Phone #: ###-####
|
BLD-Final | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to occ unit 101 after fire finals
|
BLD-Final | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to occ unit 402 after fire finals
|
BLD-Final | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | CANC |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Energy code compliance | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to start sheet rocking
|
BLD-Conference | 11/2/2018 | 11/5/2018 | 11/5/2018 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to insulate
|