BLD-Final | 4/8/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Mike Jordan
|
|
|
call 10 mins ahead- Spencer Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
call 10 mins ahead- Spencer Phone #: ###-####
|
BLD-Final | 3/28/2019 | 4/2/2019 | 4/2/2019 | A | NR |
Mike Jordan
|
|
|
Spencer Phone #: ###-####
|
FIRE-Final Inspection | 3/28/2019 | 4/1/2019 | 4/1/2019 | A | FAIL |
Troy Cobbley
|
|
|
Replace the painted sprinkler heads, provide sticker at main exit, provide racking permit for the storage racks over 8'-0"
after nine // Spencer Phone #: ###-####
|
BLD-Framing/Rough-in | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Mike Jordan
|
|
|
Spencer Phone #: ###-####
|
BLD-Framing/Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | FAIL |
Mike Jordan
|
|
|
Spencer Phone #: ###-####. Remove screws from top track to grid and install kickersat 4 ft. oc. Needs to do electrical work for switches and get inspected as well.
|