BLD-Final | 11/16/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Dave Hannah
|
|
|
Scott-please call 30 minutes prior to meet Phone #: ###-####
|
FIRE-Final Inspection | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications (fire sprinkler annual inspection is current), no fire alarm modifications, fire extinguishers are placed with current ins[pection tags. Addressing needs to be installed before BLD permit final. Final life fire safety inspection for area of work complete.
Scott-please call 30 minutes prior to meet Phone #: ###-####
|