BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PEND |
Mike Jordan
|
|
|
Daniel Phone #: ###-####. Handrail ok. Will be ok to final once plumbing has finaled.
|
BLD-Final | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | NR |
Jim Sly
|
|
|
Daniel Phone #: ###-#### Need Plumb final.....Move address #s not buying handrail grippable surface as built. Install conventional handrails.
|
BLD-Final | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | FAIL |
Tony Young
|
|
|
Daniel Phone #: ###-####, / c/n posted,, needs a grippable handrail per code on exterior steps, needs address facing Irving, trades
|
BLD-Other | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Mike Jordan
|
|
|
Daniel-block & tie Phone #: ###-####. Block and tie only ok.
|