DOC - Permit Finaled | | | 1/28/2019 | | DONE |
|
|
|
Passed final 1/25/19
|
BLD-Final | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 1/23/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Page
|
|
|
Fire alarm inspection has been finaled, final life fire safety inspection for area of work complete.
|
BLD-Final | 1/18/2019 | 1/18/2019 | 1/18/2019 | A | CANC |
Jim Sly
|
|
|
Jon Craft Phone #: ###-#### Inspection requested via web by Jonathan Craft Need fire final.
|
FIRE-Final Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Jon.
jon craft Phone #: ###-#### Inspection requested via web by Jonathan Craft
|
BLD-Final | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | PART |
Jim Sly
|
|
|
john Phone #: ###-#### OK for Temp. Occ. OK for Perm Occ. when fire alarm issues resolved and fire finals.
|
FIRE-Final Inspection | 1/3/2019 | 1/3/2019 | 1/3/2019 | P | PART |
Troy Cobbley
|
|
|
A temp for life safety is being given with Ron's permission until the project related fire alarm permit is inspected and passed.
john Phone #: ###-####
|
BLD-Final | 12/31/2018 | 1/2/2019 | 1/2/2019 | P | NR |
Jim Sly
|
|
|
John Phone #: ###-#### Need fire final.
|
FIRE-Final Inspection | 12/31/2018 | 1/2/2019 | 1/2/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire alarm modifications, provide final for the sprinkler permit, repair the exit signs and emergency lights
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Office space
|
BLD-Framing/Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PART |
Jim Sly
|
|
|
Sean Phone #: ###-#### Select walls...OK
|