BLD-Final | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | PASS |
Tell Riley
|
|
|
Jay Phone #: ###-####//signed card--final occupancy ok//
|
FIRE-Final Inspection | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Call for access 30 mins- Jay Phone #: ###-####
|
BLD-Aging Inspection | 12/17/2019 | 12/17/2019 | 12/18/2019 | | PASS |
Tell Riley
|
|
|
WIP
|
FIRE-Final Inspection | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is ok with the fire dept approval until the existing fire dept access as been modified as discussed to cut back the trees and provide a ramp. jay Phone #: ###-####
|
BLD-Final | 10/14/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Tell Riley
|
|
|
Jay Phone #: ###-####/for temporary occupancy only//need final statement from special inspections//will need permanant signatures prior to permanant occupancy//
|
FIRE-Final Inspection | 10/11/2019 | 10/14/2019 | 10/14/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit inspected/finaled for a temporary to be given due to the fire dept access issues.
jay Phone #: ###-####
|
FIRE-Final Inspection | 10/2/2019 | 10/3/2019 | 10/3/2019 | P | FAIL |
Troy Cobbley
|
|
|
The fire dept access needs addressed as discussed, need K class fire extinguisher, need thumbturn deadbolt on Kitchen door addressed, need the project related fire alarm and hood suppression permits finaled. Jay Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Tell Riley
|
|
|
JAY Phone #: ###-####
|
BLD-Conference | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | DONE |
Tell Riley
|
|
|
Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Tell Riley
|
|
|
Jay Phone #: ###-####//ok to cover walls//trades rough ins complete//call for grid inspection//
|
BLD-Concrete | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PART |
Jim Sly
|
|
|
CMU-Jay Phone #: ###-#### Up to 4 feet........OK pending MTI special inspection, tests and approvals.
|
BLD-Foundation | 3/19/2019 | 3/20/2019 | 3/21/2019 | P | PEND |
Dave Hannah
|
|
|
Jay Phone #: ###-#### ok after spec inspection sign off
|
BLD-Footing | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | PASS |
Dave Hannah
|
|
|
Jay- Would like to pour by 10 am please Phone #: ###-####
|