Permit Number | BLD18-04300 |
Status | Finaled |
Name |
STRAIGHT LINE BUILDING SOLUTIONS LL
|
Site Address |
250 S 5TH ST Unit: 302
|
Project Name | ConvergeOne - Suite 302 |
Customer Number | |
ePlanReview | Yes |
Description |
(CONVERGEONE – 3RD FLOOR - SUITE #302) The fire sprinkler system is used for high rise. Permit is to remodel an existing 7,670 sq. ft. tenant space on the 3rd floor by dividing it into two separate tenant spaces, this tenant space is to be 2,913 sq. ft. and the remaining 4,757 sq. ft. is to be an unoccupied tenant space created under BLD18-04299. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames and relocate select doors, removal of select millwork, construction of select interior nonbearing wall to demise tenant spaces, nonbearing walls to create an office, a server room, a workroom, a conference room and a reception/waiting area, select wall infill, select new door/door frames, select new interior windows, select new millwork, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
|