BLD-Final | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Jim Storey
|
|
|
Garage code 1207 Phone #: ###-#### Inspection requested via web by Elena Stephens
|
DOC - Permit Finaled | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | DONE |
Jim Storey
|
|
|
4.3
|
BLD-Energy code compliance | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Energy code compliance | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | CANC |
Jim Storey
|
|
|
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
|
BLD-Framing/Rough-in | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | CANC |
Jim Storey
|
|
|
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
|
BLD-Framing/Rough-in | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | FAIL |
Brandon Shaw
|
|
|
No corrections made...
|
Extend Permit 90/180 days | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PART |
Jim Storey
|
|
|
ok to insulate/ engineer letter pending
|
BLD-Framing/Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | FAIL |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote hangers over nailled penatration below face of hangers/ have hanger rep field review the instal and sub mit letter as how to fix.// plm over dril 40 to 60% must be doubled.
|
BLD-Wall Bracing | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Wall Bracing | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | PEND |
Brandon Shaw
|
|
|
Nail up stairs wall brace panels per plans- edge and field...
|
BLD-Wall Bracing | 2/14/2019 | 2/15/2019 | 2/15/2019 | P | FAIL |
Brandon Shaw
|
|
|
Finish nailing all wall brace panels, edge/field nailng, blocking... Need Engineering approval for over driven and missing nail heads with in all straps, see plans for locations...
|
BLD-Footing | 1/2/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Jim Storey
|
|
|
Will be ready to pour at 1:00. Inspection requested via web by Marc Foote
|