BLD-Blower Door Test Results | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | DONE |
Tell Riley
|
|
|
4.86 ach50
1670 cfm @ 50 pa
|
BLD-Final | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Tell Riley
|
|
|
Call for access // Willie Phone #: ###-####
|
DOC - Permit Finaled | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Jim Sly
|
|
|
Willy Phone #: ###-####
|
BLD-Framing/Rough-in | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PART |
Mike Jordan
|
|
|
Jeffrey Phone #: ###-####. Provide tempered glazing window next to shower/tub upstairs. Ok to insulate.
|
BLD-Wall Bracing | 4/26/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Jim Sly
|
|
|
Willie Phone #: ###-####
|
BLD-Foundation | 3/22/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Jim Sly
|
|
|
as early afternoon as possible.....wall // Mark Phone #: ###-####
|
BLD-Footing | 3/21/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Dave Hannah
|
|
|
concrete at 245 // Mark Phone #: ###-####
|