BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. ok for prm occ.
|
BLD-Final | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PART |
Mike Jordan
|
|
|
Johnathan Phone #: ###-####. Ok for temp occ.. needs to install doors and glass enclosure around humidor.
|
FIRE-Final Inspection | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Johnathan Phone #: ###-####
|
BLD-Final | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | CANC |
Mike Jordan
|
|
|
John Phone #: ###-####
|
FIRE-Final Inspection | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | FAIL |
Troy Cobbley
|
|
|
Finish installing the ceiling tile and repair the exit signs at the front and rear doors.
John Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type scheduled. John Phone #: ###-####
|
BLD-Framing/Rough-in | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PART |
Mike Jordan
|
|
|
Jon Phone #: ###-####. Interior wood stud framing for new door framing and humidor ok, Pending MEP rough in inspection.
|
BLD-Framing/Rough-in | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | NR |
Mike Jordan
|
|
|
John Phone #: ###-####. No plans on site. Will need to rescedule. Appears framing not all completed, still needs electrical and mech permits.
|