BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 11/8/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 11/8/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Jim Storey
|
|
|
c/n on insulation and grade protection at garage ok
|
BLD-Framing/Rough-in | 11/8/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Jim Storey
|
|
|
p/l eave at garage ok per planreview only blk at wall ine for protection new code pervision not adopted but allowed as dirceted.
|
BLD-Framing/Rough-in | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | FAIL |
Jim Storey
|
|
|
Bret Phone #: ###-#### 3ft side set back eave 1 hr not adressed by aproved plans//
|
BLD-Wall Bracing | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PASS |
Jim Storey
|
|
|
Bret Phone #: ###-####
|
BLD-Footing | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### min 24 inches frost depth// fil and grade isues.
|
BLD-Framing/Rough-in | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 6/19/2019 | 6/20/2019 | 6/20/2019 | P | PART |
Jim Storey
|
|
|
John Phone #: ###-#### rim joist at stair need to verify insulation.
|
BLD-Framing/Rough-in | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | CANC |
Tell Riley
|
|
|
John Phone #: ###-####//frame ok per plans.//call for energy inspection.//
|
BLD-Wall Bracing | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
BLD-Foundation | 3/7/2019 | 3/8/2019 | 3/8/2019 | P | PART |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|