BLD-Final | 3/21/2019 | 3/22/2019 | 3/21/2019 | A | PASS |
Jim Sly
|
|
|
Special Inspection Report emailed to Jim Sly 3/21/19 at 1257pm Phone #: ###-#### Inspection requested via web by Cassandra Hessing Final letter of approval was recieved from ABCO Engineers. Stamped, signed and dated......by David Briggs Final....OK
|
BLD-Footing | 2/18/2019 | 2/19/2019 | 2/20/2019 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Cassandra Hessing Need final special inspection letter of approval........for project.
|