BLD-Final | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
DOC - Permit Finaled | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | NR |
Jim Storey
|
|
|
Contractor on site, Mike Oatney phone # ###-####.
Thanks, Jeff Phone #: ###-#### Inspection requested via web by JEFF SOLOMON
|
BLD-Energy code compliance | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by JEFF SOLOMON
|
BLD-Framing/Rough-in | 3/20/2019 | 3/22/2019 | 3/22/2019 | A | PART |
Brandon Shaw
|
|
|
Finish air/foam seal- perimeter wall at floor level, and all gaps where light is visiable... Seal all horizontal penetrations... Isulate and cover with vapor berrier behind tub/shower...
|
BLD-Framing/Rough-in | 3/19/2019 | 3/21/2019 | 3/20/2019 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by JEFF SOLOMON Inspection cancelled from web by: JEFF SOLOMON
|
BLD-Framing/Rough-in | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | FAIL |
Jim Storey
|
|
|
Shane Phone #: ###-#### need mech permit and insp./need truss engineering/need air seal aplaid before framing.
|
BLD-Framing/Rough-in | 3/12/2019 | 3/15/2019 | 3/15/2019 | P | PART |
Jim Storey
|
|
|
The phone number above is for the contractor Mike Oatney who will be on site. Unit is off the alley behind 1319 S. Vermont. Thanks, Jeff Solomon Phone #: ###-#### Inspection sheer ok to cover need trade sign offs/ airseal/ truss engineering
|
BLD-Footing | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | PASS |
Jim Storey
|
|
|
The phone number above is for my contractor, Mike Oatney. Any issues, please call me the owner at ###-####, Jeff Solomon. Sorry I am disabled and cannot be on site, so the contractor will be there. Phone #: ###-#### Inspection requested via web by JEFF SOLOMON
|