BLD-Blower Door Test Results | 6/28/2019 | 6/28/2019 | 6/28/2019 | A | DONE |
Tell Riley
|
|
|
ACH50 3.3 1500cfm@50Pa
|
BLD-Final | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Tell Riley
|
|
|
Adam Phone #: ###-####//final complete per plans//
|
DOC - Permit Finaled | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Jim Storey
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 4/9/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Jim Storey
|
|
|
Adam Phone #: ###-####
|
BLD-Wall Bracing | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PART |
Brandon Shaw
|
|
|
Work in progress... Exterior only... Interior shear to be installed before framing rough-in...
|
BLD-Foundation | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | PART |
Mike Jordan
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|