BLD-Aging Inspection | 5/28/2020 | 5/28/2020 | 6/3/2020 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 6/3/2020 | 6/3/2020 | 6/3/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | PASS |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection for area of work complete.
Bruce Phone #: ###-####
|
FIRE-Conference | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | DONE |
Jim Page
|
|
|
Need to verify if Protex permit needs inspected, FIR19-00466, Webster Fire has permit for area of work that is finaled and attached in project related cases.
Bruce Phone #: ###-####
|
BLD-Final | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PART |
Dave Hannah
|
|
|
Bruce ###-#### (fire approved TCO) ok for tco ok for perm co after fire gos perm
|
FIRE-Final Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm is partially complete (see notes entered under FIR19-00529), fire extinguishers are placed with current inspection tags. Partial final for life fire safety complete, TCO authorized for life fire safety for 90 days contingent on main fire alarm head unti replacement inspections being finaled.
|
BLD-Ceiling Grid Inspection | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Mike Jordan
|
|
|
Dennis Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | NH |
Tony Young
|
|
|
Dennis Phone #: ###-####
|
BLD-Framing/Rough-in | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Dave Hannah
|
|
|
Dennis Phone #: ###-####
|
BLD-Framing/Rough-in | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Dave Hannah
|
|
|
Dennis Phone #: ###-####
|