BLD-Final | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Dave Hannah
|
|
|
Shawn-please call 1/2 hr prior to meet Phone #: ###-####
|
DOC - Permit Finaled | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed (breakroom extinguisher will be placed in discussed location) with current inspection tags. Final life fire safety inspection for area of work complete.
Call ahead 30 minutes - Sean Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | PASS |
Dave Hannah
|
|
|
call 30mins ahead-Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Dave Hannah
|
|
|
Shawn- please call 30 min in advaced Phone #: ###-####
|