Permit Information
Permit NumberBLD19-00531
StatusIssued
Name ESI
Site Address 11928 W FAIRVIEW AVE
Project NameVillage East - Building G
Customer NumberBLD19-00526-00536, 538-539
ePlanReviewNo
Description
(13 PERMITS IN EPLAN UNDER BLD19-00526) (BUILDING G – VILLAGE EAST APARTMENTS – RESIDENTIAL) (PUD18-00042) (DRH18-00528) The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 22,793 square foot, 4 story apartment building (5,959 square foot 1st story, 5,959 square foot 2nd story, 5,959 square foot 3rd story, and 4,916 square foot 4th story) with a total of 16 dwelling units (4 on each story). All dwelling units on the 1st story are required to comply as Type B dwelling units (one is also required to comply as Type A in Building G and in Building K). Since there is no elevator in this building, the dwelling units located on the 2nd, 3rd and 4th stories are not regulated for accessibility to the disabled. Work is to include concrete footings, concrete stem walls between conditioned and unconditioned spaces, concrete pedestals, concrete slab on grade with thickened slab at interior bearing walls and R-10 perimeter slab edge insulation between conditioned and unconditioned spaces, 2x6 walls between conditioned and unconditioned spaces with R-20 cavity insulation and R-3.8 continuous insulation, wood columns, shear walls with gypsum panels or structural wood panels and hold downs, an unconditioned 1-hr fire-resistance-rated corridor on each story, two unconditioned 2-hr fire-resistance-rated exterior stairways, 1-hr dwelling unit separation walls between dwelling units, draftstops in the attic, 1-hr dwelling unit separation floors between dwelling units, engineered wood truss roof system with a structural wood panel roof deck and R-49 insulation installed on top of the ceiling with the attic vented to the outside, roof overbuilds, ladder and roof hatch to access roof top heat pumps, exterior windows, interior doors between conditioned and unconditioned spaces, exterior cementitious lap siding, exterior brick veneer, exterior stucco, guards, handrails, asphalt shingles, 3-ply roofing membrane at flat roof areas, roof drains and overflow drains, interior millwork, and interior finishes. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The design for the engineered wood trusses is a deferred submittal item. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/30/20206/30/20206/30/2020 CANC
DetailsTell Riley
BLD-Aging Inspection6/29/20206/29/20206/30/2020 PASS
DetailsTell Riley