Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD19-00708
StatusFinaled
Name FURST CONSTRUCTION COMPANY INC
Site Address 1175 W LAKE HAZEL LN
Project NameODFL Boise Addition
Customer Number 
ePlanReviewYes
Description
(OLD DOMINION FREIGHT LINE) To construct an 18,575 square feet addition to an existing one-story office and warehouse building and related site improvements. **Special Inspections** are required for the structural steel, welding, post-installed concrete anchors, and wind resistance per the attached form #310. This building will be constructed with concrete panel exterior walls and a pre-engineered metal building roof structure. Permit to include the concrete exterior walls, pre-engineered metal roof, light gauge metal framed interior walls, doors, new men’s and women’s restrooms, replacement of existing plumbing fixtures at existing office area, new office area, new storage/janitors closet, service bay doors, new mechanical, plumbing, and electrical work. The warehouse addition will have a ten-foot metal overhang over the loading dock areas. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **JHB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/14/20205/15/20205/15/2020APASS
DetailsJim Storey
Steve Phone #: ###-####
FIRE-Final Inspection5/13/20205/14/20205/14/2020APASS
DetailsTroy Cobbley
Life safety passed. The two narrow gates and Opticon accepted by Forrest France, Boise Fire. Steve Phone #: ###-####
FIRE-Final Inspection5/13/20205/13/20205/13/2020PFAIL
DetailsTroy Cobbley
no small documents on site
BLD-Ceiling Grid Inspection4/17/20204/20/20204/20/2020APASS
DetailsJim Storey
screened // Steve Phone #: ###-####
BLD-Framing/Rough-in2/4/20202/5/20202/5/2020APASS
DetailsJim Storey
Steve Phone #: ###-#### exterior insulation and framing ok pending others.
BLD-Concrete1/16/20201/17/20201/17/2020PPASS
DetailsJim Storey
rebar floor slab // Steve Phone #: ###-#### rebar ok
BLD-Footing11/13/201911/14/201911/14/2019APASS
DetailsJim Storey
Rebar // Steve Phone #: ###-#### south ft pass
BLD-Concrete11/11/201911/12/201911/12/2019ADONE
DetailsJim Storey
Rebar, Building pad Phone #: ###-#### Inspection requested via web by Steve Harrison si insp.
BLD-Footing11/5/201911/6/201911/6/2019PPASS
DetailsJim Storey
rebar - pouring at 2pm // Steve Phone #: ###-#### east side ok
BLD-Footing11/4/201911/4/201911/4/2019PPART
DetailsJim Storey
pouring at 2pm- Steve Phone #: ###-#### west side rebar ok pending si w strata