BLD-Final | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Final | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### ok for temp tco
|
FIRE-Final Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
|
BLD-Ceiling Grid Inspection | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####// fire caulking complete
|
BLD-Ceiling Grid Inspection | 9/25/2019 | 9/26/2019 | 9/26/2019 | P | PART |
Tell Riley
|
|
|
Mike Phone #: ###-####//need to fix mechanical penetrations through smoke barrier//need to seal penetration through smoke barrier in corridors//correction notice issued//ok to flood areas outside smoke or fire barriers//
|
BLD-Framing/Rough-in | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Dave Hannah
|
|
|
Dennis Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### ne corner of 3rd fl ok to flood rest of floor ok to cut in bourders
|
BLD-Framing/Rough-in | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Dave Hannah
|
|
|
bruce Phone #: ###-#### south half ok to cover walls
|
BLD-Framing/Rough-in | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Dave Hannah
|
|
|
Dennis Phone #: ###-####
|