BLD-Final | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Tell Riley
|
|
|
Please call for garage code. ###-#### Phone #: ###-#### Inspection requested via web by Aron Mock
|
DOC - Permit Finaled | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 5/29/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Brandon Shaw
|
|
|
If it’s possible to do this first thing that would be greatly appreciated. Call Aron with any concerns. Thanks! Phone #: ###-#### Inspection requested via web by Aron Mock
|
BLD-Framing/Rough-in | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Jim Sly
|
|
|
Please see framers on site and call me if there are any problems. Plans and truss engineering in box in kitchen. Phone #: ###-#### Inspection requested via web by Aron Mock
|
BLD-Wall Bracing | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Aron Mock
|
BLD-Foundation | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Sly
|
|
|
Jose Phone #: ###-####
|
BLD-Footing | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Jim Sly
|
|
|
Jose Phone #: ###-####
|