BLD-Final | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Tony Young
|
|
|
Noah Phone #: ###-####
|
DOC - Permit Finaled | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, ok pending DRH permit
|
BLD-Conference | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PART |
Tony Young
|
|
|
Leah Phone #: ###-####,, look at job prior to the final,, mostly cosmetic concerns,, needs step on front,, needs address
|
BLD-Framing/Rough-in | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Tony Young
|
|
|
Noah Phone #: ###-####,, footings not looked at but per owner and contractor was 30" deep with 4 rebar in sonotube,, frame ok to cover
|