BLD-Energy code compliance | 5/26/2020 | 5/27/2020 | 5/27/2020 | A | PASS |
Tell Riley
|
|
|
screened // Dave Phone #: ###-####//shear was previously inspected, just not noted//energy ok//deck framinng ok per plans//
|
BLD-Framing/Rough-in | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Tell Riley
|
|
|
Michael Phone #: ###-####//ok to insulate the shop area and ceiling// loft is unfinished//add uplift hardware to deck rafters and shop rafters//
|
BLD-Framing/Rough-in | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | NR |
Tell Riley
|
|
|
Michael Phone #: ###-####//conference for framing questions//
|
BLD-Foundation | 7/11/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Tell Riley
|
|
|
corrections made//ok to pour wall//
|
BLD-Wall cover | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | CANC |
Tell Riley
|
|
|
Terry Phone #: ###-####
|
BLD-Footing | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | FAIL |
Tell Riley
|
|
|
Terry- wall footing inspection Phone #: ###-####//foundation wall//tie rebar horizontals into existing//add corner bar//pour footing at step down//
|
BLD-Foundation | 7/5/2019 | 7/8/2019 | 7/8/2019 | A | NR |
Tell Riley
|
|
|
Terry Phone #: ###-####
|
BLD-Foundation | 7/3/2019 | 7/5/2019 | 7/5/2019 | P | NR |
Tell Riley
|
|
|
Terry Phone #: ###-####//will call in when ready///
|
BLD-Footing | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PART |
Tell Riley
|
|
|
Terry Phone #: ###-####//add Z bars to footing at step down// all other rebar ok//setbacks ok-match exisitng//
|