BLD-Final | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Dave Hannah
|
|
|
Garage Code: 2583 - changed front door threshold to measure 7 3/4 - added step to backdoor - installed handles for crawl - sealed garage. Phone #: ###-#### Inspection requested via web by Braden Holbrook
|
DOC - Permit Finaled | 5/13/2020 | 5/12/2020 | 5/13/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | FAIL |
Tell Riley
|
|
|
Garage code: 2583 Phone #: ###-#### Inspection requested via web by Braden Holbrook//CN posted, left on laundry room counter//
|
BLD-Wall cover | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//framing corrections made//insulation ok//
|
BLD-Framing/Rough-in | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//add truss bracing and header as noted//ok to insulate//
|
BLD-Conference | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | DONE |
Tell Riley
|
|
|
Still waiting for HVAC final but thought since you would be checking the property next door that you could review and tell us if there are any items we should do before final. Thanks Phone #: ###-#### Inspection requested via web by Braden Holbrook
|
BLD-Wall Bracing | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//corrections made//
|
BLD-Wall Bracing | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | NR |
Tell Riley
|
|
|
Sorry, we forgot to leave the plans. They should be there now. Phone #: ###-#### Inspection requested via web by Braden Holbrook//need to finish portal frame per details and add blocking per plans//discussed onsite//
|
BLD-Wall Bracing | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//no plans onsite//
|
BLD-Foundation | 9/7/2019 | 9/9/2019 | 9/9/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//WIP///
|
BLD-Footing | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Braden Holbrook//setbacks measured onsite per plans//footings wip//
|