BLD-Final | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
DOC - Permit Finaled | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####.. work in progress on handrail and safety film on glass
|
BLD-Final | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, needs rails, tempered glass, etc
|
BLD-Energy code compliance | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Energy code compliance | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####,, ok to cover pending adding SDS screws in the ledger and bracing the south gable per plan
|
BLD-Energy code compliance | 8/28/2019 | 8/29/2019 | 8/29/2019 | P | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, frame corrections not done
|
BLD-Framing/Rough-in | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, ok to insulate,, brace gables and overlap truss braces,, also seal property line wall in attic area
|
BLD-Wall cover | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | FAIL |
Tony Young
|
|
|
Ron Phone #: ###-####,, c/notice posted,, needs plans/ truss engineering,, point loads, toe nails, seal top of common firewall,, seal all holes
|
BLD-Wall Bracing | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Dave Hannah
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | FAIL |
Brandon Shaw
|
|
|
Hold downs to be nailed as per Manfac. install instruc... Interior shear panels to be as per plans...
|
BLD-Other | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | PART |
Tony Young
|
|
|
Aaarin- for attic fire wall Phone #: ###-####,, porch area ok
|
BLD-Other | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PART |
Tony Young
|
|
|
fire wall insp// Aaron Phone #: ###-####,, main area 2nd floor ok
|
BLD-Wall Bracing | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PART |
Tony Young
|
|
|
party wall // Aaron Phone #: ###-####,, 1st layer of firewall,, work in progress,, ok
|
BLD-Footing | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Tony Young
|
|
|
rebar-Austin Phone #: ###-####,, front footings,, interior walls ok
|
BLD-Foundation | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PART |
Tony Young
|
|
|
rebar // Austin Phone #: ###-####,, interior footings ok
|
BLD-Footing | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PART |
Tony Young
|
|
|
rebar Phone #: ###-####,, walls ok on same footings
|
BLD-Footing | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | NR |
Tony Young
|
|
|
rebar Phone #: ###-####
|
BLD-Foundation | 5/31/2019 | 6/3/2019 | 6/3/2019 | A | PART |
Tony Young
|
|
|
Austin Phone #: ###-####,, rear and outside footings ok,,
|