Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD19-01685
StatusFinaled
Name HARDING HOMES INC
Site Address 3425 N WINSOME RD
Project NameChaney Residence
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2750 sq. ft., two story (first story 1717 sq. ft., second story 1033 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 767 sq. ft. of covered patio/porch and a 716 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1B zoning and setbacks per planning. ***RDP*** ***SPRINKLERS REQUIRED PER SUB16-00048*** NOTED ON SITE PLAN. LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions. All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/6/20205/7/20205/7/2020APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson
DOC - Permit Finaled5/7/20205/7/20205/7/2020PPASS
DetailsTony Young
BLD-Final5/4/20205/5/20205/6/2020PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson
BLD-Final5/1/20205/4/20205/5/2020PPEND
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson
BLD-Final4/30/20205/1/20205/1/2020PPEND
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson// pend mech,, all else ok
BLD-Final4/29/20204/30/20204/30/2020APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson// house ok now,, just needs final on the outside fireplace
BLD-Final4/28/20204/29/20204/29/2020ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson// walk through only,, needs P/W hillside pass,, mech pass on outdoor fireplace,, verify underfloor seal etc., exterior reveal on foundation from landscape, fire caulk
BLD-Energy code compliance1/9/20201/9/20201/9/2020PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson
BLD-Energy code compliance1/8/20201/9/20201/9/2020APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson// met w/ owner, contractor and insulation contractor to go over minor issues,, will re-inspect in pm
BLD-Energy code compliance1/8/20201/8/20201/8/2020PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson
BLD-Energy code compliance1/2/20201/2/20201/2/2020PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson,, c/n posted,, needs to finish framing,, needs plumbing re-inspection on added fixtures, etc. re-insulate areas,, insulate rim as needed
BLD-Framing/Rough-in12/27/201912/27/201912/27/2019PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson
BLD-Other12/27/201912/27/201912/27/2019PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by James Jackson// soffits work in progress, ok
BLD-Wall Bracing10/30/201910/31/201910/31/2019APASS
DetailsTony Young
Dennis Phone #: ###-####,, exterior ok
BLD-Foundation8/21/20198/22/20198/22/2019APART
DetailsTony Young
1 oclock pour // mark Phone #: ###-####.. added to missed footings
BLD-Footing8/21/20198/21/20198/21/2019PPASS
DetailsTony Young
Mark-would like inspection as late AM as possible-has a pour time of 1:15 Phone #: ###-####
BLD-Footing8/19/20198/20/20198/21/2019APART
DetailsTony Young
Mark-would like inspection as late AM as possible-has a pour time of 1:15 Phone #: ###-####,, work was in progress,, needed soils approval,, now ok