BLD-Final | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Tony Young
|
|
|
Craig Phone #: ###-####
|
DOC - Permit Finaled | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | DONE |
Tony Young
|
|
|
Craig Phone #: ###-####// 4.0
|
BLD-Energy code compliance | 9/18/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Craig Phone #: ###-####
|
BLD-Framing/Rough-in | 9/18/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Brandon Shaw
|
|
|
Corrections not complete... Provide Engineering approval for cut top trusses, see red paint, first floor living room...
|
BLD-Energy code compliance | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Dave Hannah
|
|
|
gREG Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2019 | 9/10/2019 | 9/10/2019 | P | PART |
Tell Riley
|
|
|
Craig Phone #: 208-407-808//most corrections made//need to fire block at stair platforns//add re-inforcement to joists per engineering//ok to insulate only//
|
BLD-Framing/Rough-in | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | FAIL |
Tony Young
|
|
|
Freg Phone #: ###-####,, c/n posted,, cut joists, straps, block joists, nail hangers, seal holes in plates, tighten hold down nuts, support stringer, etc, see paint for reference
|
BLD-Wall Bracing | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Dave Hannah
|
|
|
Shear inspection please. Thank you! Phone #: ###-#### Inspection requested via web by Craig Hammett
|
BLD-Foundation | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Tony Young
|
|
|
wall // john Phone #: ###-####
|
BLD-Footing | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Tony Young
|
|
|
Jon Phone #: ###-####
|