BLD-Blower Door Test Results | 3/31/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/31/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 4.3
|
BLD-Energy code compliance | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Brandon Shaw
|
|
|
Disregard previous enrty... Framing corrections SAT...
|
BLD-Energy code compliance | 1/30/2020 | 1/31/2020 | 1/30/2020 | A | FAIL |
Brandon Shaw
|
|
|
See previous entry- Fire and Life... 30 day TCO is OK'd... No other issues...
|
BLD-Framing/Rough-in | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Brandon Shaw
|
|
|
Corrections are SAT...
|
BLD-Framing/Rough-in | 1/27/2020 | 1/29/2020 | 1/29/2020 | A | FAIL |
Brandon Shaw
|
|
|
Strap needed at break in double top plate... Provide Engineering fix for A1 (3) that are split/broken at bearing wall, garage/bonus room... A7G trus, bottom cord to be fastened as per Engineering, 2 row staggered at 2" o.c.... OK to insulate...
|
BLD-Blower Door Test Results | 1/6/2020 | 1/9/2020 | 1/9/2020 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Final | 1/6/2020 | 1/9/2020 | 1/9/2020 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Wall Bracing | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Eber Phone #: ###-####
|
BLD-Foundation | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|