BLD-Final | 8/12/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Tell Riley
|
|
|
kaleb Phone #: ###-####//final complete//
|
DOC - Permit Finaled | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Tell Riley
|
|
|
|
FIRE-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 | P | CANC |
Troy Cobbley
|
|
|
No life safety sign off required.
kaleb Phone #: ###-####
|
BLD-Energy code compliance | 7/16/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Tell Riley
|
|
|
Caleb Phone #: ###-####
|
BLD-Framing/Rough-in | 7/15/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tell Riley
|
|
|
Caleb Phone #: ###-####//corrections made// egress window installed//
|
BLD-Framing/Rough-in | 6/28/2019 | 7/1/2019 | 7/1/2019 | A | PART |
Tell Riley
|
|
|
Caleb Phone #: ###-####//Escape window does not meet code requiements--discussed changing out window to meet the code//ok to insulate// window will need changed prior to framing pass//
|
BLD-Wall Bracing | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Tell Riley
|
|
|
Kaleb Phone #: ###-####//add blocking at braced locations. nail all edges at blocking.//
|
BLD-Conference | 5/31/2019 | 6/3/2019 | 6/3/2019 | A | CANC |
Mike Jordan
|
|
|
Call ahead // Caleb Phone #: ###-####
|
BLD-Footing | 6/3/2019 | 6/3/2019 | 6/3/2019 | A | PASS |
Mike Jordan
|
|
|
Call ahead // Caleb Phone #: ###-####
|
BLD-Footing | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | NH |
Brandon Shaw
|
|
|
Caleb- Phone #: ###-####
|