BLD-Final | 7/13/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Jim Storey
|
|
|
screened // David Phone #: ###-####
|
DOC - Permit Finaled | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | DONE |
Jim Storey
|
|
|
screened // David Phone #: ###-#### 3.6
|
BLD-Energy code compliance | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PART |
Tony Young
|
|
|
David- **Cleared** Phone #: ###-####,, frame ok to insulate,, need to verify seal pack and furr downs for ducting,, fire blocking
|
BLD-Wall Bracing | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Wall Bracing | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PART |
Jim Storey
|
|
|
shear // David Phone #: ###-####hd/ north wall nailling
|