BLD-Final | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|
FIRE-Final Inspection | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Troy Cobbley
|
|
|
**PASS Fire Final. Tenant GC still waiting on core&shell to be finaled. Perm Occ signed.MAS**
josh Phone #: ###-####
|
BLD-Final | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PART |
Mike Jordan
|
|
|
Ok for temp occ. Will be ok for perm occ. once life/safety signs perm. and shell and core has bee signed off.
|
FIRE-Final Inspection | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PART |
Mike Jordan
|
|
|
JOSH Phone #: ###-####. A temp. occupancy is given upon the condition that the South west exterior emergency light is repaired and functional by the end of today (10-17-19)
|
FIRE-Final Inspection | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | CANC |
Troy Cobbley
|
|
|
Need the shell/core building permit finaled first. I spoke to josh about this. jOSH Phone #: ###-####
|
FIRE-Final Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | FAIL |
Jim Page
|
|
|
Final inspection for core and shell life fire safety has not been completed under BLD18-04470, permit is still in issued status. Final fire sprinkler inspections for FIR19-00233 and FIR19-00234 for core and shell has not been completed. Final fire sprinkler inspection for TI fire sprinkler modifications, FIR19-00573, has not completed. Final fire alarm inspection for TI fire alarm install, FIR19-00663 has not been completed. Final life fire safety for core and shell, final inspections for all FIR permits needs to be completed before TI life fire safety inspection will be completed.
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2019 | 9/10/2019 | 9/11/2019 | P | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PART |
Dave Hannah
|
|
|
Josh Phone #: ###-#### ok to one side if ok with elec.
|