BLD-Final | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | PASS |
Tell Riley
|
|
|
tAILOR Phone #: ###-####//corrections made//final complete//
|
DOC - Permit Finaled | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PART |
Tell Riley
|
|
|
Chris Phone #: ###-####//window safety glazed//handrail needs 1.5 inch clearance from wall--return end to post//notified contrator via phone//deck is complete//
|
BLD-Framing/Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Tell Riley
|
|
|
Tayler Phone #: ###-####//framing ok when anchor bolts and mechanical connections are complete at pier pads//window in stairwell will need to be safety glazed prior to final inspection//
|
BLD-Concrete | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PART |
Tell Riley
|
|
|
stairs- Chris Phone #: ###-####//elevate rebar to maintain clearances from subgrade//
|
BLD-Foundation | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | NR |
Tell Riley
|
|
|
concrete // Chris Phone #: ###-####//not ready//no steps formed or rebar installed//
|
BLD-Footing | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Tell Riley
|
|
|
Chris- stem wall inspection Phone #: ###-####//wall rebar ok per engineering and plans//
|
BLD-Footing | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Tell Riley
|
|
|
Taylor Phone #: ###-####//depth and rebar ok per plans//
|
BLD-Footing | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | NR |
Tell Riley
|
|
|
Taylor Phone #: ###-####
|