BLD-Aging Inspection | 7/31/2020 | 7/31/2020 | 7/31/2020 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
Extend Permit 90/180 days | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 3/18/2020 | 3/19/2020 | 3/19/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Will Henggeler
|
BLD-Framing/Rough-in | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Will Henggeler
|
BLD-Wall Bracing | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Dave Hannah
|
|
|
Has a partial. Phone #: ###-#### Inspection requested via web by Will Henggeler
|
BLD-Wall Bracing | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Brandon Shaw
|
|
|
shear inspection for garage OK to cover...
|
BLD-Conference | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PART |
Brandon Shaw
|
|
|
shear inspection... Hold downs to be as per plans before framing ruogh-in...
|
BLD-Foundation | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Tony Young
|
|
|
Stoop and pier pad inspection. Also a pre-slab inspection. Concrete and pumped scheduled for 11:45am. Foundation is monolithic. Phone #: ###-#### Inspection requested via web by Cameron Martin/// will need to get frost protection by final
|
BLD-Foundation | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Garage wall. Work in progress...
|
BLD-Foundation | 9/14/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Main house, gargae and covered patio footings to be at later date...
|
BLD-Footing | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|