Permit Information
Permit NumberBLD19-02227
StatusIssued
Name FLYNNER PROPERTIES LLC
Site Address 415 W RESSEGUIE ST
Project NameParker Residence
Customer NumberDEMO BLD19-02354
ePlanReviewYes
Description
**SEPERATE DEMO PERMIT** Permit for the construction of a new 2803sq' two story with basement (first story 1342sq', second story 485sq', below grade 976sq') single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 210sq' of covered patio/porch and a 484sq' dettached garage per the approved plans, local codes & ordinances. R-1CH zoning and setbacks per Zoning. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/31/20207/31/20207/31/2020 DEFR
DetailsBrandon Shaw
Work in progress...
Extend Permit 90/180 days7/31/20207/31/20207/31/2020PDONE
DetailsBrandon Shaw
BLD-Wall cover3/18/20203/19/20203/19/2020PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Will Henggeler
BLD-Framing/Rough-in2/19/20202/19/20202/19/2020PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Will Henggeler
BLD-Wall Bracing2/14/20202/18/20202/18/2020APASS
DetailsDave Hannah
Has a partial. Phone #: ###-#### Inspection requested via web by Will Henggeler
BLD-Wall Bracing12/30/201912/30/201912/30/2019PPASS
DetailsBrandon Shaw
shear inspection for garage
OK to cover...
BLD-Conference12/3/201912/4/201912/4/2019APART
DetailsBrandon Shaw
shear inspection...
Hold downs to be as per plans before framing ruogh-in...
BLD-Foundation10/10/201910/11/201910/11/2019APASS
DetailsTony Young
Stoop and pier pad inspection. Also a pre-slab inspection. Concrete and pumped scheduled for 11:45am. Foundation is monolithic. Phone #: ###-#### Inspection requested via web by Cameron Martin/// will need to get frost protection by final
BLD-Foundation9/19/20199/20/20199/20/2019APASS
DetailsBrandon Shaw
Garage wall.
Work in progress...
BLD-Foundation9/14/20199/16/20199/16/2019APASS
DetailsBrandon Shaw
Work in progress...
Main house, gargae and covered patio footings to be at later date...
BLD-Footing9/4/20199/5/20199/5/2019APASS
DetailsBrandon Shaw
Work in progress...