Information based on query as of Monday, June 24, 2024.
Permit Information
Permit NumberBLD19-02327
StatusIssued
Name CORVUS CONSTRUCTION LLC
Site Address 4701 W JEWELL ST
Project NameBrookside Remodel not an ADU
Customer Number 
ePlanReviewNo
Description
Permit for a 455sq' addition and full gut-to-the-studs remodel. A large portion of the roof is being removed and replaced with trusses. Final floor plan is 3bd/2bth. All work per plans, notations, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/17/20204/17/20204/20/2020 PEND
DetailsTell Riley
no contact regarding zoning approval
BLD-Final12/4/201912/5/201912/5/2019PPART
DetailsTell Riley
Jamie Phone #: ###-####//corrections made for handrails//building requirements ok//need zoning completed//will check back in 60 days//
BLD-Final12/4/201912/4/201912/4/2019PFAIL
DetailsTell Riley
Jamie Phone #: ###-####//CN issued add handrail back steps and ramps//verify parking is ok with zoning//
BLD-Wall cover10/9/201910/10/201910/10/2019APART
DetailsTell Riley
Damie Phone #: ###-####//added hangers to ceiling joists ok//still need engineered truss changes for beraing points and header loads for added loading over 2 2x10 window header///proceed at own risk--until letter is provided and approved//
BLD-Wall cover10/8/201910/9/201910/9/2019AFAIL
DetailsTell Riley
BAMI- please go after 9am Phone #: ###-####//need truss engineering for header in bedroom is sufficient--added bearing mid span of truss--provide new truss engineering--add bearing points to footings in crawlspace//added hangers need to be installed correctly//will need re-inspection//
BLD-Framing/Rough-in10/7/201910/7/201910/7/2019PPASS
DetailsTell Riley
Damie Phone #: ###-####//will need to verify header in existing for the two 2 ply girders//add studs under 2 ply girder//add hangers to ceiling/floor joists in attic// ok to insulate only//
BLD-Wall Bracing8/19/20198/20/20198/20/2019PPART
DetailsTell Riley
Dan Phone #: ###-####//nailing ok//need to add hold downs where they missed or are damaged// noted on plans//
BLD-Foundation7/1/20197/3/20197/3/2019APART
DetailsTell Riley
Call prior to going Phone #: 2085145825 >> Inspection requested via mobile web by Damie Lasater//need to install hold downs//work progress//
BLD-Conference7/3/20197/3/20197/3/2019ACANC
DetailsTell Riley
Phone #: 2085145825 >> Inspection requested via mobile web by Damie lasater Inspection cancelled via mobile web on Wednesday, July 03, 2019.
BLD-Footing6/29/20197/1/20197/1/2019APASS
DetailsTell Riley
As early as possible Phone #: 2085145825 >> Inspection requested via mobile web by Damie lasater//setbacks ok//footing rebar installed//