BLD-Aging Inspection | 4/17/2020 | 4/17/2020 | 4/20/2020 | | PEND |
Tell Riley
|
|
|
no contact regarding zoning approval
|
BLD-Final | 12/4/2019 | 12/5/2019 | 12/5/2019 | P | PART |
Tell Riley
|
|
|
Jamie Phone #: ###-####//corrections made for handrails//building requirements ok//need zoning completed//will check back in 60 days//
|
BLD-Final | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | FAIL |
Tell Riley
|
|
|
Jamie Phone #: ###-####//CN issued add handrail back steps and ramps//verify parking is ok with zoning//
|
BLD-Wall cover | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | PART |
Tell Riley
|
|
|
Damie Phone #: ###-####//added hangers to ceiling joists ok//still need engineered truss changes for beraing points and header loads for added loading over 2 2x10 window header///proceed at own risk--until letter is provided and approved//
|
BLD-Wall cover | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | FAIL |
Tell Riley
|
|
|
BAMI- please go after 9am Phone #: ###-####//need truss engineering for header in bedroom is sufficient--added bearing mid span of truss--provide new truss engineering--add bearing points to footings in crawlspace//added hangers need to be installed correctly//will need re-inspection//
|
BLD-Framing/Rough-in | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Tell Riley
|
|
|
Damie Phone #: ###-####//will need to verify header in existing for the two 2 ply girders//add studs under 2 ply girder//add hangers to ceiling/floor joists in attic// ok to insulate only//
|
BLD-Wall Bracing | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | PART |
Tell Riley
|
|
|
Dan Phone #: ###-####//nailing ok//need to add hold downs where they missed or are damaged// noted on plans//
|
BLD-Foundation | 7/1/2019 | 7/3/2019 | 7/3/2019 | A | PART |
Tell Riley
|
|
|
Call prior to going Phone #: 2085145825 >> Inspection requested via mobile web by Damie Lasater//need to install hold downs//work progress//
|
BLD-Conference | 7/3/2019 | 7/3/2019 | 7/3/2019 | A | CANC |
Tell Riley
|
|
|
Phone #: 2085145825 >> Inspection requested via mobile web by Damie lasater Inspection cancelled via mobile web on Wednesday, July 03, 2019.
|
BLD-Footing | 6/29/2019 | 7/1/2019 | 7/1/2019 | A | PASS |
Tell Riley
|
|
|
As early as possible Phone #: 2085145825 >> Inspection requested via mobile web by Damie lasater//setbacks ok//footing rebar installed//
|