BLD-Final | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Tell Riley
|
|
|
Call Wes Phone #: ###-#### Inspection requested via web by Wes palm//CDHD signature was confirmed via photo from Wes//final is now complete for occupancy//
|
BLD-Final | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | PART |
Tell Riley
|
|
|
Please Call Wes Palm Phone #: ###-#### Inspection requested via web by Wes palm//architect provided clarification on handrails and guard//need CDHD approval for final//Temp ok until CDHD complete//
|
BLD-Final | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | NR |
Tell Riley
|
|
|
Please call Wes Palm at ###-#### Phone #: ###-#### Inspection requested via web by Wes palm/used as conference/walk through//need information from architect regard the guardrail at the back of building and one side of handrail at stairs 34" and other side 36"//
|
FIRE-Final Inspection | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Please Call Wes @ ###-#### Phone #: ###-#### Inspection requested via web by Wes palm
|
BLD-Energy code compliance | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PART |
Tell Riley
|
|
|
Insulation / Cover Inspection at Fire Riser Room Phone #: ###-#### Inspection requested via web by Wes palm//add insulation as discussed//architect provided 1hr detail//light needs to surface mount//door needs to be 1hr per plans, current door is not rated//
|
BLD-Energy code compliance | 3/25/2020 | 3/26/2020 | 3/26/2020 | P | PART |
Tell Riley
|
|
|
Final insulation inspection for cover at attic area. Phone #: ###-#### Inspection requested via web by Wes palm//ok in attic area//
|
BLD-Energy code compliance | 3/23/2020 | 3/24/2020 | 3/24/2020 | A | PART |
Tell Riley
|
|
|
Insulation inspection for cover at tower and bar locations. Phone #: ###-#### Inspection requested via web by Wes palm//tower and bar area ok//
|
BLD-Energy code compliance | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | CANC |
Tell Riley
|
|
|
Partial inspection of insulation for cover at tower and bar area lid. Please call Wes P with any concerns Phone #: ###-#### Inspection requested via web by Wes palm
|
BLD-Wall cover | 3/12/2020 | 3/13/2020 | 3/13/2020 | P | PART |
Tell Riley
|
|
|
Inspection for cover at main floor exterior walls and seating area lid. Phone #: ###-#### Inspection requested via web by Wes palm//ok to cover walls--do not cover fire riser room--need rated assembly documents//ok to cover lid in dining area pending fire sprinkler approval//
|
BLD-Framing/Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Tell Riley
|
|
|
Please Call Wes with any questions at the number listed above. Phone #: ###-#### call 30 minutes//ok to insulate//a few corrections and interior shear needs verified//
|
BLD-Framing/Rough-in | 3/3/2020 | 3/4/2020 | 3/4/2020 | P | NR |
Tell Riley
|
|
|
Please Call Wes with any questions at the number listed above. Phone #: ###-#### Inspection requested via web by Wes palm//multiple framing corrections, Wes has notes and plans have been marked//will come back 3/4//
|
BLD-Wall Bracing | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PART |
Tell Riley
|
|
|
RE-INSPECTION for completed Items including noted strapping at windows per details on plans ; noted truss blocking per truss details and plans at strapping required on roof decking. Phone #: ###-#### Inspection requested via web by Wes Harrison//truss blocking installed//strapping installed and nailed per plans// exterior nailing and shear ok//
|
BLD-Wall Bracing | 2/10/2020 | 2/11/2020 | 2/11/2020 | P | CANC |
Tell Riley
|
|
|
RE-INSPECTION for completed Items including noted strapping at windows per details on plans & noted truss blocking per truss details and plans at strapping required on roof decking. Phone #: ###-#### >> Inspection requested via web by Wes Harrison Inspection cancelled from web by: Wes Harrison
|
BLD-Wall Bracing | 2/6/2020 | 2/7/2020 | 2/7/2020 | P | PART |
Tell Riley
|
|
|
Hoping to also have you look at small insulated areas before cover at TPO areas. Phone #: ###-#### Inspection requested via web by Wes palm//flat roof and floor decking ok//ok to insulate upper wall areas to finish exterior sheathing//need to add strapping at windows per details on plans// add truss blocking per truss details and plans at strapping required on roof decking//
|
BLD-Concrete | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PART |
Tell Riley
|
|
|
rebar - slab // Shane Phone #: ###-####//need to add transverse bars//WIP// pending specials//
|
BLD-Energy code compliance | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PART |
Tell Riley
|
|
|
Foundation insulation, late PM if possible. Phone #: ###-#### Inspection requested via web by Michael McHargue//ok per plan//will need to add 2' return under slab per drawings//
|
BLD-Foundation | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Tell Riley
|
|
|
Dane Phone #: ###-####//ok pending specials//
|
BLD-Footing | 11/6/2019 | 11/7/2019 | 11/7/2019 | P | PART |
Tell Riley
|
|
|
Dane Phone #: ###-####//ok pending special inspections//
|