BLD-Blower Door Test Results | 12/11/2019 | 12/11/2019 | 12/11/2019 | A | DONE |
Tell Riley
|
|
|
4.22 ACH 50
|
BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Tell Riley
|
|
|
|
DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 10/4/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//framin corrections made// insulation ok//ok to cover//
|
BLD-Other | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Tell Riley
|
|
|
Soffits//1 hr soffits installed per plans and notes//
|
BLD-Framing/Rough-in | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//correction notice posted//
|
BLD-Framing/Rough-in | 9/27/2019 | 9/27/2019 | 9/27/2019 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//need rough ins for mechanical completed and inspected prior to framing//
|
BLD-Wall Bracing | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//nailing on exterior ok only// check bolts and straps at framing//
|
BLD-Foundation | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Tell Riley
|
|
|
Mark-wants to pour at noon Phone #: ###-####
|
BLD-Footing | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Tell Riley
|
|
|
Mark-would like as late am as possible Phone #: ###-####//setbacks ok per plans//
|