BLD-Final | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | CANC |
Tell Riley
|
|
|
Please call Jon Craft Phone #: ###-#### Inspection requested via web by Jonathan Craft
|
BLD-Final | 12/13/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Tell Riley
|
|
|
Please call Jon Craft Phone #: ###-#### Inspection requested via web by Jonathan Craft//final complete per plans//signed card//
|
FIRE-Final Inspection | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/14/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Craft//2nd half of grid ok//
|
BLD-Ceiling Grid Inspection | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PART |
Tell Riley
|
|
|
John Craft ###-####//suite 100 ok pending mechanical//fire caulk penetrations that appear to be in a fire wall//will check when grid for 150 is ready//
|
BLD-Ceiling Grid Inspection | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | NR |
Tell Riley
|
|
|
John Phone #: ###-####//need fire sprinkler pass//
|
BLD-Framing/Rough-in | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Tell Riley
|
|
|
John Phone #: ###-####//wall framing only// wiill call for grid//
|